Back

Who we are

Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.


Overview
Back

What we do

WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.


Overview
Back

Projects

We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.


Overview
Back

Products

Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.


Overview
Back

Career

Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.


Overview

Road renewal with substructure rehabilitation Kesswil

At Kesswil railroad station, Walo Bertschinger AG Ostschweiz was commissioned by the Swiss Federal Railways SBB to carry out a pavement renewal project including substructure rehabilitation.

Project description

At the Kesswil railroad station, WALO Bertschinger Ostschweiz was commissioned by the Swiss Federal Railways SBB to carry out a road renewal including substructure rehabilitation on line 824 between Uttwil and Güttingen.

For the subgrade rehabilitation, the drainage had to be connected to the municipal sewer system via an intervention shaft. For the pavement renewal, the old ballast was removed and processed in the WALO washing plant, saving around 65 tons of CO2.

With the help of the Bomag combination roller, which is equipped for recording the dynamic surface compaction, the compaction could be checked in terms of area at any time, recorded and finally handed over to the SBB for quality control.

Challenges

Due to the short construction period and the comprehensive logistics planning, the pavement renewal at Kesswil station presented the entire team with major challenges. While the planning and preparatory work had to be completed within just two weeks, only seven days remained for the construction work. This meant that the work steps had to mesh precisely, which required close coordination between all departments. In addition, a sophisticated logistics concept had to ensure that all around 1,000 trucks delivered the material to the right place at the right time in order to keep to the tight schedule.

20220307_Walo_B_Kesswil_LSD_7758
2022 04 08_Goldach_Kesswil_SBB Zertifizierung_Titelbild Newsbeitrag_V2
2022 04 08_Goldach_Kesswil_SBB Zertifizierung_Titelbild Newsbeitrag_V3
2022 04 08_Goldach_Kesswil_SBB Zertifizierung_Titelbild Newsbeitrag
Contact

Walo Bertschinger AG Ostschweiz
Schuppis 21
9403 Goldach

Location
Kesswil, TG
Service

Total Contracting

Road Construction & Civil Engineering

Trackwork & Rail Engineering

Civil Engineering

Laboratory

Building time
February - March 2022
Construction sum
CHF 1'350'000
Builder
Swiss Federal Railways SBB