• Who we are
  • What we do
  • Projects
  • Products
  • Career
  • Contact
  • Who we are
  • What we do
  • Projects
  • Products
  • Career
  • Contact
Back

Who we are

Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.


Overview
Back

What we do

WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.


Overview
Back

Projects

We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.


Overview
Back

Products

Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.


Overview
Back

Career

Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.


Overview

Kinzig Dam, Germany

Read about the rehabilitation of Kinzig Dam in Germany, which maintained its flood protection function through modernization and reshaping of the crest area, all completed in just four days with thorough preparation and specialist skills.

Case Study Description

The Kinzig Dam (built in 1976 -1981) is located in the Main-Kinzig area, east of Frankfurt. Germany. The dam is part of a flood protection scheme and also functions as a small HEP station and a recreation facility, being a popular destination for fishing cycling and walking.

A regular inspection had revealed cracks in the asphalt lining and damages to the mastic protection layer. The monitoring system and the connection between the dam facing and crest also needed modernizing.

Dense asphaltic concrete is dense, durable, flexible and robust enough to resist mechanical, chemical or biological attack. It is also safe for humans, fauna or flora, making it ideal for dam lining. However, like any other structure, after decades of operation, maintenance and rehabilitation will be needed.

Experience has shown that bituminous linings in basal areas or areas permanently under water do not show any signs of ageing. The ‘water exchange zone’ – the area where the water changes height – is the area which over time may become weathered. This was the situation at the Kinzig Dam so just the upper part of the dam and the surface of the darn face needed rehabilitation.

The Kinzig Darn crest is 550 m long and the area of the slope to be rehabilitated ranged from 20 to 35 m long with an area of 5.200 m2 and an incline of 1:2 to 1:4.

The dam’s flood protection function had to be maintained throughout the works, which needed to be carried out above water. This meant that the time between the existing lining being partially removed and the new DAC layer being installed was limited to just one week, depending on stable, favorable weather conditions. Precautions also had to be taken to prevent any contamination of the water from milled material falling into it. The clients also decided to improve the installation by re-shaping the crest area to reduce future maintenance costs.

Metal barriers were installed on the slope surface to channel surface water into lateral sumps and to prevent milled material from falling into the water. Oil barriers were also placed in the water to prevent any possible contamination. The milled material contained PAH (Polycyclic Aromatic Hydrocarbons) so special safety precautions had to be undertaken for the workers and at the milling machine.

A milling machine especially constructed for working on steep slopes, secured by a large winch, milled off the top 40 mm of the impermeable layer, leaving 40 mm dense asphalt for flood protection. The milled material was taken via a conveyor belt to the top of the dam crest where it was bagged and then safely disposed of.

A new 100 mm bituminous drainage layer and a new 70 mm DAC layer were installed onto the existing lining system using a slope paver. All the machines were supported by winches. After milling off the complete DAC liner at the darn toe, the new drainage and dense layers were installed – all the works were completed in just four days due to thorough preparation and specialist skills.

The dam now has a ‘controlled lining system’ according to the technical requirements. This means that if the top seal is damaged and water manages to leak through. it will run down a second seal to the bottom of the dam which will not cause further damage. The spillway and crest joint constructions were also reconstructed and a new mastic coat applied.

walo-us-project-kinzig-dam-rehabilitation-01
Contact

Walo Bertschinger AG
Giessenstrasse 5
8953 Dietikon 1

Location
Germany
Service

Asphalt Hydraulic Engineering

Share page
placeholder_hero_3

Contact us

We appreciate your interest in the WALO Group and will be happy to answer any questions you may have.

© 2024 Walo Bertschinger. All rights reserved.