• Who we are
  • What we do
  • Projects
  • Products
  • Career
  • Contact
  • Who we are
  • What we do
  • Projects
  • Products
  • Career
  • Contact
Back

Who we are

Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.


Overview
Back

What we do

WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.


Overview
Back

Projects

We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.


Overview
Back

Products

Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.


Overview
Back

Career

Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.


Overview

Péry-La Heutte: new bridge construction with traffic still running

At Péry-La Heutte, WALO built two new bridges for the Swiss Federal Roads Office (FEDRO) over the N16 Transjurane highway – with motorway and rail traffic still running and in a valley with barely any space for construction-related logistics.
Aerial view of the construction site for two new bridges on the N16 near Péry-La Heutte, showing the supporting scaffolding, cranes and motorway and rail traffic continuing as normal.
Aerial view of a building site on the N16 near Péry-La Heutte, showing a roundabout, construction machinery and traffic flowing.
Scaffolding and formwork for the construction of a new bridge on the N16 near Péry-La Heutte.

The commission: replacement of two bridges over the N16

Commissioned by the Swiss Federal Roads Office (FEDRO), WALO replaced two motorway bridges over the N16 Transjurane highway at Péry-La Heutte, in the canton of Bern, with work taking place from July 2024 to December 2026. The new structures replaced an existing old crossing and, in future, will separate passenger vehicles from freight. The TaBö combined planning association was responsible for coordinating the project, and the construction budget amounted to around CHF 40 million.

Unusual features: digital formwork planning and severe limitations in terms of construction-related logistics

The narrowness of the valley left practically no space for interim storage at the construction site: the river, railway line, motorway and a cement works already occupied all of the valley floor. Incoming materials had to observe a strict timetable – with no more than three lorries a day and over 800 tonnes of falsework material in total.

The formwork was not created on site, but emerged in digital form: a 3D model from the engineer was sent to the formwork supplier Doka, who prefabricated the elements and delivered them on a just-in-time basis. The falsework girders spanned a distance of up to 22 metres with no intermediate supports, on top of shoring towers with 1000 kilonewtons bearing down on each support.

“No question about it, the formwork took us 20 to 30 per cent less time, compared with having to provide it on site in the conventional way”, says Antonio D’Onofrio, the site manager from WALO.

The delivery stage: three complete closures and a crawler crane with a load capacity of 750 tonnes

The old bridge was dismantled at night: the team cut the structure into two parts, lifted them away with a 750-tonne crawler crane and only broke them up once they were on the ground. In total, the N16 highway and railway line had to close completely three times in order to provide the time windows required – including day, night and weekend work.

The result: deadline met and maximum satisfaction

The new bridge was opened on 18 September 2026. Since then, the region has benefited from having two separate structures as opposed to a single crossing – one for passenger vehicles, one for freight – and, as a result, from traffic flowing noticeably more freely along a busy section of the N16 Transjurane highway.

“This project shows how to coordinate a project at a challenging site, with road and rail traffic still running and without jeopardising safety or deadlines as a result”, says Laurent Brugger, project manager at FEDRO.

“A project on this scale, with road and rail traffic still running, calls for much more than a good technical solution. Other key factors include precise preparation, short decision-making processes and a team that delivers even during challenging construction phases. These are the very same strengths we showed at Péry.” Fabian Frieden, Head of Civil Engineering West

Aerial view of a bridge construction site on the N16 near Péry-La Heutte, showing the new bridge, the roundabout and traffic flowing.
Bridge construction on the N16 near Péry-La Heutte, with construction traffic on the new bridge and normal traffic flowing on the road below.
Aerial view of the bridge construction site on the N16 near Péry-La Heutte, showing cranes, a railway line and traffic flowing along the road.
Contact

Walo Bertschinger AG Bern
Feldstrasse 42
3073 Gümligen

Location
Péry-La Heutte
Canton of Bern
Service

Road Construction & Civil Engineering

Civil Engineering

Building time
July 2024 – December 2026
Construction sum
around CHF 40 million
Builder
Details
  • 800 t of UniKit falsework material

  • 22 m span without intermediate supports

  • 750 t crawler crane for dismantling work

  • Type 4.1 exposed concrete walls

  • Reinforcement work 700,000 kg

  • Concrete 6000 m3

  • Shotcrete 500 m2

  • Lengthwise/crosswise pretensioning: around 6000 linear metres

  • 60 large bored piles and 50 micro piles

  • Poured asphalt 500 t

  • Asphalt surface 3500 t

  • Dismantled concrete 5000 m3

  • Excavated material 30,000 m3

Share page
placeholder_hero_3

Contact us

We appreciate your interest in the WALO Group and are happy to answer any questions you may have.

Walo Bertschinger AG

Headquarters
Giessenstrasse 5
Postfach, 8953 Dietikon 1

© 2026 Walo Bertschinger. All rights reserved.