Who we are
Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.
What we do
WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.
Projects
We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.
Products
Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.
Career
Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.
Locations
With our locations in three countries, we are successfully active for you worldwide.
Commissioned by the Swiss Federal Roads Office (FEDRO), WALO replaced two motorway bridges over the N16 Transjurane highway at Péry-La Heutte, in the canton of Bern, with work taking place from July 2024 to December 2026. The new structures replaced an existing old crossing and, in future, will separate passenger vehicles from freight. The TaBö combined planning association was responsible for coordinating the project, and the construction budget amounted to around CHF 40 million.
The narrowness of the valley left practically no space for interim storage at the construction site: the river, railway line, motorway and a cement works already occupied all of the valley floor. Incoming materials had to observe a strict timetable – with no more than three lorries a day and over 800 tonnes of falsework material in total.
The formwork was not created on site, but emerged in digital form: a 3D model from the engineer was sent to the formwork supplier Doka, who prefabricated the elements and delivered them on a just-in-time basis. The falsework girders spanned a distance of up to 22 metres with no intermediate supports, on top of shoring towers with 1000 kilonewtons bearing down on each support.
“No question about it, the formwork took us 20 to 30 per cent less time, compared with having to provide it on site in the conventional way”, says Antonio D’Onofrio, the site manager from WALO.
The old bridge was dismantled at night: the team cut the structure into two parts, lifted them away with a 750-tonne crawler crane and only broke them up once they were on the ground. In total, the N16 highway and railway line had to close completely three times in order to provide the time windows required – including day, night and weekend work.
The new bridge was opened on 18 September 2026. Since then, the region has benefited from having two separate structures as opposed to a single crossing – one for passenger vehicles, one for freight – and, as a result, from traffic flowing noticeably more freely along a busy section of the N16 Transjurane highway.
“This project shows how to coordinate a project at a challenging site, with road and rail traffic still running and without jeopardising safety or deadlines as a result”, says Laurent Brugger, project manager at FEDRO.
“A project on this scale, with road and rail traffic still running, calls for much more than a good technical solution. Other key factors include precise preparation, short decision-making processes and a team that delivers even during challenging construction phases. These are the very same strengths we showed at Péry.” Fabian Frieden, Head of Civil Engineering West
Walo Bertschinger AG Bern
Feldstrasse 42
3073 Gümligen
Road Construction & Civil Engineering
Civil Engineering
800 t of UniKit falsework material
22 m span without intermediate supports
750 t crawler crane for dismantling work
Type 4.1 exposed concrete walls
Reinforcement work 700,000 kg
Concrete 6000 m3
Shotcrete 500 m2
Lengthwise/crosswise pretensioning: around 6000 linear metres
60 large bored piles and 50 micro piles
Poured asphalt 500 t
Asphalt surface 3500 t
Dismantled concrete 5000 m3
Excavated material 30,000 m3