Back

Who we are

Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.


Overview
Back

What we do

WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.


Overview
Back

Projects

We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.


Overview
Back

Products

Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.


Overview
Back

Career

Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.


Overview

FIFA Museum, Zurich

On a total of 3,000 m2 of exhibition space, spread over three floors, the world football association presents a unique collection of football history.

Project description

The FIFA Museum building is located in the center of the city of Zurich, opposite the Enge train station. On a total of 3'000 m2 exhibition space, distributed over three floors, the world football association presents a unique collection of football history.

 

Construction process

The start of the flooring work by WALO in the FIFA Museum was able to begin shortly before the summer vacations in 2015. Under great logistical and scheduling challenges, the RUB TAN outdoor sports flooring was installed in several stages as an indoor flooring with aesthetically high and functional requirements. An interesting job also for the experienced WALO employees.

 

Comment

The final result is more than respectable. WALO received great praise for the exact execution of the work and the quality, including the final acceptance. The museum was ceremoniously opened on February 28, 2016. It is well worth a visit.

 

Special features

Many differently shaped mounds were modeled with cement-bonded foam glass ballast and the cavity floor load of 500 kg/m2 had to be adhered to. After the intermediate acceptance and the final shape, the base layer with black rubber granules and the trowel (as a moisture barrier) could be created. For the second layer, the colored rubber granulate wearing course, each daily stage was precisely coordinated so that there was no interruption of work that would have resulted in the formation of visible joints.

WALO_Sportbelag_FIFA_Museum5-1
WALO_Sportbelag_FIFA_Museum-1
WALO_Sportbelag_FIFA_Museum2-1
WALO_Sportbelag_FIFA_Museum1
Contact

Walo Bertschinger AG
Giessenstrasse 5
8953 Dietikon 1

Service

Leisure Surfaces

Share page
placeholder_hero_3

Contact us

We appreciate your interest in the WALO Group and will be happy to answer any questions you may have.

© 2024 Walo Bertschinger. All rights reserved.